Monday, August 25, 2008
After a 5-month hiatus (FIVE?!) from Rambling Rose, I have finally laid aside my irrational anger towards reknitting the buttonbands.
Rico...Suave...
I've only knitted the left-side buttonband, but considering how LITTLE TIME it took for me to get it done, and to get it done right, I am ashamed of myself and quite embarrassed for waiting this long to do it. Rambling Rose laid crunched up in a plastic bag for all this time, beautiful beautful Rambling Rose please forgive me.
Based on the very helpful comments from this post, I was able to pick up the correct number of stitches for the band. I had a slipped-stitch selvege for the front right and left panels, and had picked up and knit each of those slipped sts for the buttonband. It resulted in major puckering and pulling in of the fabric; clearly my ratio of 1:2 was short; I cried; I swore; I threw it aside in disgust. When all I really had to do was go for a ratio of 2:3 by picking up every slipped stitch, and knitting through the front and back of every other stitch as well (I usually pick up all stitches first, and then knit them. I find the mechanics to be much easier this way).
Worked like a charm! Happy happy joy joy. So the plan is to finish the other buttonband after work today, block tonight, head to the DMV tomorrow in Chinatown to get my license renewed and re-registered to vote (IMPORTANT!), and then stop by Windsor Buttons for the perfect set of buttons, which I will then immediately sew on as soon as I return home. And Rambling Rose at long last will be finished done complete, wheeeee!
Filed Under: Rambling Rose